E-Mail: info(at)mooser.net

Tel.: +49 (0)89 | 804348

Reference filter

 

Notice:
All reference photos shown are site photos and are subject to the risk evaluation of the website visitor or user.

 

Tunnel Polakovica

Construction Method: mined tunnel

Company: Avax Group

Year: 2021

 

external vibrators for tunnel concrete compaction
concrete compaction of mined tunnel with Mooser external vibrators
ooser external vibrators at Peri Formwork Carriager external vibrators
c external vibrators for tunnel concrete compactionumatic external vibrators