Tunnel Hollrich, Tunnel Langenau

 

Construction Method:  Refurbishment; widening of the existing building and new installation of single-sided wall + vault blocks

Company: Baresel GmbH

Year: 2012

 

Description: The Langenau Tunnel with a length of 232 meters and the Hollrich Tunnel with a length of 319 meters were built in 1860. They are about 1000 meters apart. After around 150 years, both tunnels are showing signs of age-related damage, meaning that they need to be renovated. In order to renovate the structures according to today's specifications, the cross-section radius was widened by around two meters and a new concrete inner shell was installed. Noe Top panel formwork was used to install the new inner shell. MOOSER vibrators were mounted on the cross profiles of the Noe Top formwork using the STA bracket and formwork-specific Noe Top adapters. The formwork-specific adapters were removed for the arched timber formwork so that the STA bracket could be attached directly to the squared timbers. MOOSER vibrators were also used for concrete compaction on the "Kupfereck" and "Frauenberg" tunnel construction projects on the same DB line.