Construction Method:
- mined construction for escape tunnels, turning points and vaults
- open-cut construction "Sonic Boom" for the tunnel portals
- vibrting beam for the tunnel floor
Copany: Wayss & Freytag Ingenieurbau AG, Bilfinger Berger AG, Max Bögl Bauunternehmung GmbH & Co KG, Bickhardt Bau AG
Year: 2011 – 2012
Description: Mooser formwork vibrators are used on the special timber formwork, in the escape tunnels, at the turning points and widenings on the Silberberg tunnel of the NBS Erfurt Ebensfeld, which was built using the mining method. The vibrators are mounted on the MOOSER STA bracket and can be attached to the solid timber frames of the formwork without an adapter. In addition, the vibrators were used for the portals, the so-called "Sonic Boom structures in open construction", on a timber girder formwork carriage. MOOSER Schwingungstechnik also manufactured and supplied vibrating screeds with different radii for the individual sections of the main tunnel.