E-Mail: info(at)mooser.net

Tel.: +49 (0)89 | 804348

Reference filter

 

Notice:
All reference photos shown are site photos and are subject to the risk evaluation of the website visitor or user.

 

Nord Süd Stadtbahn Cologne

 

Construction Method: open cut construction, single-sided walls

Company: Hochtief Solutions AG

Year: 2012

 

Description: As part of the north-south light rail system in Cologne, a 600 m long tunnel section was built to connect the light rail network with the banks of the Rhine and the Rheinuferbahn. The open excavation pit was secured with diaphragm walls to prevent the ingress of groundwater. For concrete compaction, Hochtief Solutions AG decided to use MOOSER VR56K formwork vibrators on an Ulma Enkoform V-100 beam formwork and Orma wall formwork. The vibrators were securely and firmly mounted on the beams with the STA bracket using the formwork-specific adapter. This vibration unit achieved very good vibration transmission to the concrete to be compacted. The challenge was to optimally compact the floor slab, walls and ceiling of the tunnel with an average thickness of 90 cm in order to guarantee the water impermeability of the structure.