Einhausung BAB A94 München-Pocking

 

Construction method: open-cut method

Construction Company: Alpine Bau Deutschland AG

Year: 2012

 

Description: A cut-and-cover tunnel underpass was built on the A94 Munich-Pocking highway in the area of Heldenheim and Ampfing. The concrete was compacted using VR56K external vibrators mounted on the H20 wooden beams. The vibrators were moved upwards along the formwork as the concrete was poured. Thanks to the low weight of the vibrators (approx. 11 kg with bracket) and the quick screw connection of the STA bracket, the vibrators can be repositioned in a period of 30 sec -1 min, saving the construction site costs compared to full equipment.