Consortium Pumped-Storage Power Plant Limmern

Construction: mined cavern, vault formwork, cable stud

 

Company: ARGE KW Limmern: Marti Tunnelbau AG, Marti AG Bauunternehmung, Marti Technik AG, Toneatti AG,       

              

Year: 2011 – 2012

 

Description:

At the Limmern pumped storage power plant in Switzerland/ Canton Glarus, MOOSER pneumatic formwork vibrators® were used to compact the vaults in the machine cavern, the transformer cavern and the slide gate cavern, where the walls are up to 1.0 m thick. The external vibrators with the STA mounting clamp were attached onto the H20 girders of the Holzco Doka vault formwork. The clamp with special H20 adaptors has a tight fit on the girder while at the same time providing optimum vibration transfer to the concrete. In a follow-up application in the cable tunnel, the MOOSER vibrators® were used on a Meva Startec formwork and on Meva H20 girders, each with the appropriate formwork adapters.