PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

Tunnel Ceneri (CH)

 

construction method:  cut-and-cover method and application of tunnel drilling machine.

company:  Jörimann Steel Formwork / Peri Formwork

year: 2012 -2013

description: 
The “Ceneri-Baisistunnel (CBT)”, situated in the federal state Tessin north of Lugano in Switzerland, serves as southerly feeder tunnel for the “Gotthard-Basistunnel”. This tunnel is constructed in cut-and-cover method, as well as drilled by a tunnel drilling machine. The tunnel has a length of 15,4km and is constructed with two tunnel tubes. Within the scope of this project, two formwork systems had been equipped with Mooser pneumatic formwork vibrators for concrete compaction: a steel-formwork carriage of the company “Jörimann” and a formwork system of the company Peri. At the steel-formwork carriage, the vibrators were mounted onto plates that had been welded onto the steel skin. For the Peri formwork carriage, vibrators were mounted directly onto the GT24 formwork girders.

>> back to overview

This website uses cookies to ensure you get the best experience on our website.