PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

S10 Tunnel Kefermarkt (A)

construction: open-cut construction 

company: Arge Porr AG HABAU Hoch -u. Tiefbaugesellschaft m.b.H

year: 2013-2014

description

The road S10 runs from the town Unterweitersdorf via Freistad to the Czech frontier. The route will be extended to a four lane road. After the completion the road will be renamed into A7 Mühlkreis highway. For the tunnel Kefermarkt, contract section 3.1, a tunnel with a twin-circular cross-section was constructed in open-cut method. For concrete pouring a Doka SL1 formwork carriage based on H20 wooden girders was used. The formwork was completely equipped with Mooser formwork vibrators for concrete compaction. Only the concrete in the region of the tunnel top was accessible from above and could be compacted by use of internal vibrators. The air supply for the vibrators was provided by an air compressor with 4-6 m³ air volume and 6-10 bar air pressure. The construction team rented the vibrators, mountig clamps and air distributors as well as all mounting material from Mooser. 

>> back to overview

 

This website uses cookies to ensure you get the best experience on our website.