PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

Cross Headings Tunnel Farchant

 

construction method: single-faced, bored construction method  

company: Jäger Bau GmbH

year: 2013

description:  

In the B2 tunnel Farchant, new cross-headings had to be constructed in order to fulfill the new safety regulations for the escape routes. Therefore a total of four new cross-headings was constructed between the lanes, in order to reduce the distance between the escape routes by half.

During summer 2013 the traffic was conducted through the west tube with only one lane, while the new cross headings were bored from the east side. The tunnel inner shell was formed with a Meva formwork carriage based on H20 wooden girders and equipped with Mooser external vibrators for concrete compaction. The vibrators were screwed onto the STA mounting clamp with H20 adaptors, in order to guarantee a tight mounting of the vibrating units (vibrator + clamp) onto the girder. At the connections between the cross-headings and the main tunnel, wall thicknesses up to 1,00m were best compacted with formwork vibrators. The regular wall thickness of the cross-heading was 40cm.

>> back to overview

This website uses cookies to ensure you get the best experience on our website.