PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

City Railway Cologne

construction method: open-cut construction, single-face walls

company: Hochtief Solutions AG

year: 2012

description: 

In the course of the City Railway in Cologne a 600m long tunnel section was constructed, in order to connect the City Railway with the Rhine-Waterside-Railway close to the waterside of the Rhine. The open excavation was proteced against entering ground water by trench walls. The company Hochtief Solutions AG decided to use VR56K formwork vibrators onto a Ulma Enkoform V-100 wooden girder formwork. The vibrators were screwed onto the STA mounting clamp and mounted onto the girder by use of a formwork specific adapter. This vibrating unit provides an excellent transmission of vibrating energy to the concrete. It was a great challenge to guarantee a waterproof construction and therefore compact the concrete of the floor, walls and ceiling of the tunnel in an optimum way.

>> back to overview

This website uses cookies to ensure you get the best experience on our website.