PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

BAB A94 München-Pocking

construction method: open-cut construction

company: Alpine Bau Deutschland AG

year: 2012

description: 

At the highway BAB A94 Munich-Pocking a tunnel underground crossing was constructed in open-cut method between the towns Heldenheim und Ampfing. The concrete was compacted with help of external vibrators VR56K, which were mounted onto H20 wooden girders of the formwork. The vibrators were relocated at the formwork in height according to the pouring process. Thanks to the low weight of the vibrating unit (vibator with mounting clamp approx. 11kg) and the quick screw fastening of the STA mounting clamp, the relocation of the vibrators is possible within a time span of 30 sec-1 min. Compared to a formwork fully equipped with vibrators, the relocation spares costs for the construction-site.

>> back to overview

This website uses cookies to ensure you get the best experience on our website.