PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

Railway underpass in Flörsheim, near Frankfurt a. Main

 

construction method: single-face formwork, in parts cut and cover construction method

company: Heinrich Walter Bau GmbH

year: 2012

description: 

In order to replace an existing railway crossing in Flörsheim, near Franfurt a. Main, a new trough structure below the railway line was constructed. The through was build as a white tank (with waterproofed concrete), because it reaches deep into ground water.

Directly below the railway line, the single face walls were constructed with cut-and-cover method. Mooser pneumatic external vibrators were mounted in two rows along the formwork length and were relocated towards the top according to the pouring process. After the use of rented vibrators at Flörsheim, the company Heinrich Walter Bau decided to buy them.

 

 »back to overview

This website uses cookies to ensure you get the best experience on our website.