PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

Pschorr House Munich

 

construction method: Ed. Züblin AG

company: Ed. Züblin AG

year: 2012

description: 

The new "Pschorr-House" commercial building in the Munich pedestrain zone is built with cut-and-cover construction method. Thus it is possible to construct from the first floor to the upper floors and at the same time under the protection of the 1st floor ceiling downwards to the basement floors.

On completion, the building will consist of four basement floors and fife upper floors. All external walls of the basement floors are constructed as single face walls in cut and cover method. Only Mooser formwork vibrators are used for their concrete compaction. 

The vibrators can be easily mounted onto Framax and H20 formwork girders by use of the new STA mounting clamp. A formwork specific adaptor of this clamp provides a tight mounting and at the same time an excellent transmission of vibrating energy to the concrete.

 

»back to overview

This website uses cookies to ensure you get the best experience on our website.