PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

Cooling Tower in Neuss

 

construction: very high fair-faced concrete walls up to a height of 11,20m

company: GWI Bauunternehmung GmbH

year: 2015

description: 

At the headquarter of the company "Aluminium Norf", a 11 m high cooling tower with 30 cm thick fair-faced concrete walls was constructed. An Ulma Orma formwork with 240/270 Orma formwork elements was used for the concrete pouring.  The concrete was compacted with the help of Mooser pneumatic external vibrators, which could be mounted onto the horizontal as well as on the vertical girders of the Ulma Orma formwork by use of formwork specific adaptors for the STA mounting clamps. Thanks to the wall thickness of only 30 cm, it was sufficient to mount the Mooser formwork vibrators only at one side of the formwork.

Upon request of the customer, Mooser-Schwingungstechnik also delivered the required internal vibrators with special hose lengths of 14 m and the adequate frequency converter.

The quality of the finished concrete surfaces and the concrete compaction were excellent.

»back to overview

This website uses cookies to ensure you get the best experience on our website.