PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

High School Trudering Munich

 

construction method: high walls, cut and cover construction method, fair-faced concrete

company: Anton Schick Bau GmbH

year: 2012

description: 

For the construction of a gymnasium of the grammer school in Trudering (Munich), fair-faced concrete walls with many cut-outs and a height of 11.50m had to be constructed in SB3-4 quality.

The walls included big cut-outs at a height of 5-7m, partly distributed along the complete length of the wall. The lower wall section, with a thickness of 40cm, was exclusively compacted by formwork vibrators, which had been mounted onto one side of the wall. The vibrators were mounted directly onto the Itec100 girders of the formwork by helps of STA mounting clamps with H20 adaptors. The walls could be constructed with excellent quality of the concrete surface. Around the cut-outs and at all edges the concrete was best compacted. The company “Schick-Bau” used Mooser external vibrators again for a short period for their construction-site at the secondary school in Olching (near Munich)

 

»back to overview

This website uses cookies to ensure you get the best experience on our website.