Events:
Keine Artikel in dieser Ansicht.
Frauenhoferinstitut ZVE Vaihingen
construction method: lateral facade contraction
company: Gottlob Brodbeck GmbH & Co. KG
year: 2010
description:
At Frauenhofer Institute ZVE in Vaihingen, a complicated fair-faced wall with an polygonal angle was built. Concrete was compacted primarily by operation of Mooser formwork vibrators. Due to the inclinations of the wall and the dense reinforcement, internal vibrators could not be used for concrete compaction. The vibrators were mounted onto one wall side of a special Peri GT24 formwork which was reinforced with additional panels. In spite of this reinforcement, vibrators had enough vibrating power for an excellent concrete compaction and the construction of best fair-faced concrete walls.