PartnerLogin

User login

Please enter you username and password.
Login

Forgot your password?

Contact Form

  1. Please contact us! We are glad to assist you!
  2. Fields with * are mandatory.
  3. Are you interested in one of the following brochures?
  4. *I have read the privacy part; and I accept.
  5. Mooser Schwingungstechnik GmbH | Lindberghstraße 3 | D-82178 Puchheim | Phone: +49 (0)89/804348 | Fax +49 (0)89/804813 | info@mooser.net
Deutsch
Español

Saadiyat Bridge (Abu Dhabi, VAE)


construction methodcantilever method /sub-structure/incremental launching/very high inclined pier heads

company: Dywidag Bau GmbH Brückenbau Nürnberg / Ed Züblin AG/ Saif Bin Darwish

year: 2008-2009

description: 

The Saadiyat Bridge with a total length of 1455m includes a total of 10 road lanes and two railway lanes. It is one of the widest bridges in the world, with a total width of 60m. Mooser formwork vibrators were used for the concrete compaction of the walls of the incremental launching, the inclined walls of the pier heads, located above the columns and the inclined walls of the cantilever sections. The wall thicknesses were approx. 60cm, so that the vibrators could be mounted only on one wall side in order to compact the concrete. By the use of the ST universal mounting clamp the vibrators could be adapted flexible either to Peri and Doka formwork systems.

 

»back to overview

 

This website uses cookies to ensure you get the best experience on our website.