Events:
Keine Artikel in dieser Ansicht.
Bogenbrücke Lustenau (Rhine)
construction method: reinforced concrete, composite construction
company: Strabag Bau AG
year: 2011-2012
description:
For the concrete compaction of the vaulted side walls with the demand for fair faced concrete quality, Mooser formwork vibrators were used onto a Doka Framax formwork. The Framax elements were reinforced with wood in order to get the arched wall form.